The Atlanta Journal-Constitution
After $1.4 billion spent and more than a decade of work to build the Atlanta airport’s gleaming new international terminal, the thing that struck Buckhead resident David Locker was the more than half-mile long hike he made after his flight from London.
“It’s an unconscionably long
Article source: http://www.ajc.com/business/new-terminal-means-long-1498046.html